Balance Vibration Technologies, Inc.

General Information
(866) 601-8935
Fax(972) 245-9867
[email protected]
TECL 27599

North Texas Office
2426 Lacy Lane
Carrollton, TX 75006
Main (214) 733-8771

South Texas Office
2493 Patton Rd. #7
Rosenberg, TX 77471
Main (713) 589-9455

Oklahoma Office
7107 S. Yale Ave. #271
Tulsa, Oklahoma 74136
Main (918) 398-9098

  • About Us
    • Locations
    • Testimonials
    • Case Studies
    • Careers
    • Company Model
  • Predictive Maintenance
    • Airborne Ultrasound Services
    • Condition Monitoring
    • Corona and Partial Discharge Surveys
    • Electric Motor Testing
    • Electrical Services
    • Field Dynamic Balancing
    • Infrared Inspections
    • Laser Alignment
    • Mechanical Services
    • Vibration Analysis
  • Products
    • CTC
    • Infrared Viewing Panes
    • ProvibTech
      • Provib Tech – Monitors
        • ProvibTech DM200 Dual-Channel Vibration Monitors
        • ProvibTech DTM Distributed Monitors
        • ProvibTech PT2060 Monitor
    • Royal Purple
      • Why Use Royal Purple
      • Royal Purple Case Study: Wet End Savings
      • Royal Purple Case Sudy: Press Suction Savings
      • Royal Purple Case Study: Energy Savings
    • The Bearing Expert
  • Contact
  • Customers
    • Customer Portal Login
    • Helpful Links
  • BVT Power Solutions
  • reliabilitydirect.com
You are here: Home / Predictive Maintenance / Corona and Partial Discharge Surveys

Corona and Partial Discharge Surveys

Corona is responsible for the generation of ultraviolet radiation, ozone, acids, heat, mechanical erosion through ion bombardment, electric power loss and electromagnetic interference with radio communications. Corona byproducts destroy insulation and leads to catastrophic failure, while remaining invisible to the eye. Our camera can detect, pinpoint and document corona, arcing, tracking and superficial partial discharge on high and medium voltage electrical lines, substations, generators, motors, distribution etc. Corona and tracking conditions are voltage problems that rarely produce heat, therefore can go undetected during a typical infrared inspection.

Partial Discharge Surveys – We can efficiently survey all of your medium voltage equipment (>600V), while it remains in service and without opening energized panels, to detect the early stages of insulation failure. This technology detects the electromagnetic pulses associated with partial insulation failure of switchgear, switch, bus duct, dry-type transformer and many other types of equipment and can effectively determine the problem location and intensity. These surveys provide early warning for impending failures and allow time to schedule repairs. Surveys can be done on equipment with load or no loading (current) conditions.

  • NFPA 70B states that insulation breakdown is the number one cause of electrical failures.
  • New safety requirements such as NFPA 70E has created the need to detect potential problems prior to opening enclosures.
  • In medium voltage equipment, partial discharges are the first indication of insulation breakdown.

Contact Us Today

Products We Offer:

CTC_WebLogo
Bearing Expert Logo
IRISS Logo Name
ProVibeTech Logo
Royal Purple Logo

Women’s Business Enterprise

Women's Business Enterprise Logo

WBENC #2005120120

General Information

(866) 601-8935
Fax (972) 245-9867
[email protected]
HUB# 1562536821000
TECL 27599

Subscribe to Our Newsletter

Copyright © 2025 ·Executive Pro Theme · Customized by Katie...WordPress Designer · Genesis Framework by StudioPress · WordPress · Log in