We are adding case studies on a regular basis. Check this page often to research some of our past projects and get detailed information on our projects and the impact we have on plant maintenance and operations.
Paper Mill Avoids downtime – Surge testing found an insulation problem, when other tests did not
Perot Systems – The equipment was one of three 1100 ton built up BAC Prichard cooling tower cells with Amarillo model 135 double reduction gear reducers and 60″ jackshafts. Permanent accelometers were mounted on gear reducers due to accessibility.
To Drive or not to Drive? – With all the concern with energy savings and efficiency, VFD’s have taken over a large percentage of motor controls. While this has helped with equipment efficiency in many applications, it has created havoc in some. Controllable pitch vaneaxial fans are one of these problem areas.